COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10152
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:FIGURE FOUR UNIT #8011D K18 498
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:260510LocationID:316287
County:RIO BLANCO #103Location:NESW 18 4S98W 6
Field:SULPHUR CREEK - #80090Elevation:8325 ft.
Basin:PICEANCE BASIN  
Planned Location:1373FSL  2006 FWLLat/Long: 39.697813 / -108.435768Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.697819 / -108.435737Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD:     Vertical TD: 10070 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore Permit
Permit #:200043317 Expiration Date:1/19/2006
Proposed Depth/Form:10070 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:FIGURE FOUR UNI Unit Number:66492X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MNCSB , Formation: MANCOS B , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 40 ft., Weight: 50 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 805 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 2110, Top: 0 ft., Bottom: 805 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 3055 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 890, Top: 0 ft., Bottom: 3055 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 10070 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1525, Top: 0 ft., Bottom: 10070 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:7/8/2001Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:10070 ft.True Vertical PB depth:11000 ft.
Log Types:CBL, CCL, GR
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 40 ft., Weight: 50 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 805 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 2110, Top: 0 ft., Bottom: 805 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 3055 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 0 ft., Bottom: 3055 ft., Determination Method: VISU
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 10070 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1525, Top: 4430 ft., Bottom: 10070 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH2249 ft.4649 ft.NN
MESAVERDE4649 ft.7350 ft.NN
ROLLINS7350 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 8079 ft.    Interval Bottom: 8086 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6610 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:8079 ft.# Of Holes:
Interval Bottom:8086 ft.Hole Size:

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 11/1/2025                 Interval Top: 7650 ft.    Interval Bottom: 7660 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2003
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:7650 ft.# Of Holes:60
Interval Bottom:7660 ft.Hole Size:

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 7470 ft.    Interval Bottom: 7480 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6619 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:7470 ft.# Of Holes:
Interval Bottom:7480 ft.Hole Size:

Formation RLNS                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 7350 ft.    Interval Bottom: 7360 ft.

 Completed Information for Formation ROLLINS
1st Production Date:6/8/2007Choke Size: 
Formation Name:ROLLINSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/2001
Treatment Summary:117 BBLS OF TONS CO2, 131180 LBS OF 20-40 SAND (10/14/01); CIBP @7340 WAS DRILLED OUT ON 06/05/07; WELL NOW COMMINGLED WITH THE WILLIAMS FORK, AND ROLLINS FORMATIONS
Tubing Size:2.375 in.Tubing Setting Depth:7237 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RLNS.
Perforation Data:
Interval Top:7350 ft.# Of Holes:60
Interval Bottom:7360 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 6630 ft.    Interval Bottom: 7315 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.500 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2003
Treatment Summary:SET CIBP @ 7340'. PERF WMFK 7191-7193, 7221-7223, 7259-7261, 7285-7287 AND 7313-7315 W/ 2 SPF. SET PKR @ 7145. ACIDIZE W/ 2000 GALS 7.5% HCL. FRAC W/ 65,264# 20/40 SAND IN 2061 BBLS FLUID. RELEASED PKR. SET PKR @ 7132'. SI WELL. RELEASE PKR. FLOW TEST.
Tubing Size:2.375 in.Tubing Setting Depth:7225 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 7
BTU_GAS 1170
CALC_BBLS_H2O 40
CALC_BBLS_OIL 7
CALC_GOR 107808
CALC_MCF_GAS 787
CASING_PRESS 470
MCF_GAS 787
TUBING_PRESS 175
Perforation Data:
Interval Top:6630 ft.# Of Holes:140
Interval Bottom:7315 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1195
GOR
GOR DeterminationMCFE
Average BOE per Day0.569
Average MCFE per Day3.287

 Federal Financial Assurance  i 

 Tribal Well  i No