|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/3/2019 Measured TD: Vertical TD: 9515 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/3/2019 | | Wellbore Permit | | | Permit #: | 010906 | Expiration Date: | 5/8/2002 | | Proposed Depth/Form: | 10600 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CRCRN , Formation: CORCORAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MNCSA , Formation: MANCOS A , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MNCSB , Formation: MANCOS B , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: S.C. 1.2, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 10600 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1500, Top: 0 ft., Bottom: 10600 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/12/2001 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 9515 ft. | True Vertical PB depth: | 10600 ft. | | Log Types: | CBL. BOND LOG | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: , Depth: 85 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 14 ft., Bottom: 85 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 406 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 14 ft., Bottom: 406 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 3500 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 1045, Top: 2000 ft., Bottom: 3500 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 9515 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1430, Top: 14 ft., Bottom: 9515 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3542 ft. | 5979 ft. | N | N | | ROLLINS | 5980 ft. | 6112 ft. | N | N | | COZZETTE | 6113 ft. | 6274 ft. | N | N | | CORCORAN | 6275 ft. | 6554 ft. | N | N | | SEGO | 6555 ft. | 7529 ft. | N | N | | MANCOS A | 7530 ft. | 7923 ft. | N | N | | MANCOS B | 7924 ft. | 9515 ft. | N | N |
Formation MNCSB Formation Classification: GW Status: AB - 7/3/2019 Interval Top: 8584 ft. Interval Bottom: 9170 ft.| Completed Information for Formation MANCOS B | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MANCOS B | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2001 | | Treatment Summary: | Well drilled & Completed by Coastal in 2001. Must use original 5A's for previous treatment.
Stages 1: 9160'-9170' 60 holes; Treated w/a total of 300 gal 15% HCL acid w/WF140 fluid and 116,500# 20/40 Mesh PR 6000 Prop SD, and 140 ton C02.
Stage 2: 8584'-8732' # of holes unknown Treated w/600 gal 7.5% HCL acid w/WF140 60Q fluid and 101,000# 20/40 Mesh PR 6000 Prop SD and 69 Ton C02. | | Formation Treatment | | Treatment Date: | 7/13/2001 | | Treatment Summary: | STAGE 3 - FRAC W/40 Q CO2 WF 135 FLUID AND 55 TON CO2 AND 87,308# 20/40 MESH PR 6000 SD. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8293 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MNCSB. |
| | Perforation Data: | | Interval Top: | 8584 ft. | # Of Holes: | 60 | | Interval Bottom: | 9170 ft. | Hole Size: | 0.33 in. |
|
Formation MNCSA Formation Classification: GW Status: AB - 7/3/2019 Interval Top: 7550 ft. Interval Bottom: 7560 ft.| Completed Information for Formation MANCOS A | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MANCOS A | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2001 | | Treatment Summary: | State 3 - Frac w/ 40 Q CO2, WF 135 Fluid, 55 Ton CO2, 87,308# 20/40 Mesh PR 6000 SD. This was originally reported as Mancos A by El Paso on 1/09/2002. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8293 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MNCSA. |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 60 | | Interval Bottom: | 7560 ft. | Hole Size: | |
|
Formation SEGO Formation Classification: GW Status: AB - 7/3/2019 Interval Top: 6620 ft. Interval Bottom: 6683 ft.| Completed Information for Formation SEGO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2001 | | Treatment Summary: | Stage 4: 6673'-6683' Frac w/ WF 140 60Q C02 and 101,280# 20/40 SD and 108 Ton C02. (El Paso reported as Sego)
Stage 5: 6620'-6673' Frac w/ YF120LG Fluid and 213,000# 20/40 Prop SD. (El Paso reported as Corcoran) with updated Encana formation tops this falls in the Sego formation.
| | Formation Treatment | | Treatment Date: | 7/13/2001 | | Treatment Summary: | STAGE 4 - FRAC W/ WF 140 60 Q CO2 AND 101,280 # 20/40 SD AND 108 TON. CO2 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8293 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 6620 ft. | # Of Holes: | 60 | | Interval Bottom: | 6683 ft. | Hole Size: | 6 in. |
|
Formation CRCRN Formation Classification: GW Status: AB - 7/3/2019 Interval Top: 5874 ft. Interval Bottom: 6673 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | SHUT - IN | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 7/13/2001 | | Treatment Summary: | STAGE 5 FRAC W/YF120 LG FLUID AND 213,000 # 20/40 PROP SD. STAGE 6 DID NOT FRAC THIS STAGE. TO WET (SHOWING TO MUCH WATER). SET PLUG @ 6000'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5624 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 5874 ft. | # Of Holes: | | | Interval Bottom: | 6673 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: AB - 7/3/2019 Interval Top: 4972 ft. Interval Bottom: 5944 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2001 | | Treatment Summary: | Stage 6: 5874'-5944' El Paso did not frac this stage, to wet. (Encana found this to be stages 6 & 7)
Stage 6: 5938-5944 No frac information available, not frac'd
Stage 7: 5874'-5882'
Stage 8: 5714'-5780'
Stage 9: 5622'-5628' Stages 7-9 Frac information available 5622'-5882': 249,500# 20/40, 3051 bbl YF 125LG fluid
State 10: 4972'-5386' could not find upper interval treatment.
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8293 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 4972 ft. | # Of Holes: | 152 | | Interval Bottom: | 5944 ft. | Hole Size: | 0.62 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/03/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|