Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-09921
Well Classification: GW Status: SI - 3/1/2024
Well Name/No:WRD FEDERAL #19-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KT RESOURCES LLC - 10775
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C0127535
Facility Status:SIStatus Date3/1/2024
FacilityID:232250LocationID:316155
County:RIO BLANCO #103Location:NWNE 19 2N96W 6
Field:WHITE RIVER - #92800Elevation:6113 ft.
Planned Location:748FNL  2033 FELLat/Long: 40.132709 / -108.205716Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.132688 / -108.205577Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2024             Measured TD: 7250 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2024
Wellbore Permit
Permit #:000593 Expiration Date:6/19/2001
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: RL-WF , Formation: ROLLINS-WILLIAMS FORK , Order: 0 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/9/2000
Spud Date:7/28/2000Spud Date Is:ACTUAL
Measured TD:7250 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:DIL-FDC-CNL-FMI-CAL-SP-GR-CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1120 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 148, Top: 0 ft., Bottom: 1120 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 8.625 in., Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: , Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7259 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 7259 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3254 ft.NN
OHIO CREEK3254 ft.4174 ft.NN
WILLIAMS FORK4174 ft.7328 ft.NN
ILES7328 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 3/1/2024                  Interval Top: 6192 ft.    Interval Bottom: 7055 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/9/2000
Treatment Summary:FRAC DOWN CSG VIA VISTAR 16 LT FLUID W/210000# 20/40 SAND. FRAC DOWN CSG VIA VISTAR FLUID W/ 84000# 20/40 SAND. FRAC DOWN CSG VIA VISTAR FLUID W/81000# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6670 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/2000Test Method:FLOWING
Hours Tested:Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 53
BBLS_OIL 0
CASING_PRESS 1500
MCF_GAS 900
TUBING_PRESS 1350
Perforation Data:
Interval Top:6192 ft.# Of Holes:100
Interval Bottom:7055 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2024 - 12/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.009

 Federal Financial Assurance  i Y

 Tribal Well  i No