Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/9/2021 | Treatment End Date: | 2/9/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 56 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 103 | Max pressure during treatment (psi): | 2180 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 56 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/9/2020 | Treatment End Date: | 4/9/2020 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 47 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 94 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 10/6/2017 | Treatment End Date: | N/A |
Treatment Summary: | Squeeze casing leak with 50 sks cement, Form 5 submitted 401421877. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 6/13/2017 | Treatment End Date: | N/A |
Treatment Summary: | TUBING PLUG WAS SET AT 6418' ON 4/4/17. TOP PERFORATION CORRECTED TO 6439' (CONTRACTOR WELLBORE SCHEMATIC WRONG). |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 10/13/2011 |
Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 20% HCL THROUGH END OF TUBING @ 6634'. |
Formation Treatment |
Treatment Date: | 8/4/1998 |
Treatment Summary: | ACID STIMULATION 10-10-07 PUMPED 4000 GALLONS 15% HCI THROUGH TUBING. |