Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-09357
Well Classification: GW Status: PR - 8/19/1989
Well Name/No:DRAGON TRAIL UNIT #1067
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:UTAH GAS OP LTD DBA UTAH GAS CORP - 10539
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:44954
Facility Status:PRStatus Date8/19/1989
FacilityID:231686LocationID:335747
County:RIO BLANCO #103Location:SWSE 27 2S102W 6
Field:DRAGON TRAIL - #18700Elevation:6789 ft.
Basin:PICEANCE BASIN  
Planned Location:210FSL  1720 FELLat/Long: 39.838659 / -108.826042Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.838803 / -108.826154Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/19/1989             Measured TD: 2841 ft.    Vertical TD: 2841 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/19/1989
Wellbore Permit
Permit #:890166 Expiration Date:7/14/1989
Proposed Depth/Form:
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:C-02866A
Formation And Spacing:Code: MNCSB , Formation: MANCOS B , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/10/1989
Measured TD:2841 ft.Measured PB depth:2776 ft.
True Vertical TD:2841 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 224 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2821 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
MANCOS A1111 ft.
MANCOS B2289 ft.

Formation MNCSB                   Formation Classification:  GW                   Status:  PR - 8/19/1989                 Interval Top: 2289 ft.

 Completed Information for Formation MANCOS B
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:MANCOS BCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MNCSB.
No Perforation Data was found for formation MNCSB.

Formation MNCS                     Formation Classification:  GW                     Status:  CM - 8/19/1989                 Interval Top: 2074 ft.    Interval Bottom: 2140 ft.

 Completed Information for Formation MANCOS
1st Production Date:N/AChoke Size: 
Formation Name:MANCOSCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/1989
Treatment Summary:PERF @ 2130'-2140',2110',2074'-2074'-2084' 4SPF FRAC W/75,700# 16/30 SD,511 BBLS 40# LINEAR GEL (30Q) & 13 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:2474 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2001Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 129
CASING_PRESS 42
MCF_GAS 129
TUBING_PRESS 18
Perforation Data:
Interval Top:2074 ft.# Of Holes:120
Interval Bottom:2140 ft.Hole Size:4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13003
GOR
GOR DeterminationMCFE
Average BOE per Day6.142
Average MCFE per Day35.622

 Federal Financial Assurance  i Y

 Tribal Well  i No