Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/30/2015 | Treatment End Date: | 6/30/2015 |
Treatment Summary: | Pumped 4000 gallons 15% HCl w/165 gallons solvent at 3.3 bpm |
Total fluid used in treatment (bbls): | 194 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 95 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/1/2013 | Treatment End Date: | 11/1/2013 |
Treatment Summary: | RUN IN HOLE WITH COILED TUBING TO 6474', PUMP 4000 GALLONS 15% HCL. |
Total fluid used in treatment (bbls): | 215 | Max pressure during treatment (psi): | 1600 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 120 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 4/12/2010 |
Treatment Summary: | ACIDIZE FORMATION WITH 3000 GALLONS 20% HCL, EOT @ 6493'. |