Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/9/2022 | Treatment End Date: | 11/9/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH INHIBITOR AND MUTUAL SOLVENT, 35 BBLS OF WATER. |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/22/2020 | Treatment End Date: | 9/22/2020 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 60 BBLS OF WATER. |
Total fluid used in treatment (bbls): | 147 | Max pressure during treatment (psi): | 2000 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 60 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/13/2019 | Treatment End Date: | 9/13/2019 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 80 BBLS OF WATER. |
Total fluid used in treatment (bbls): | 127 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/13/2015 | Treatment End Date: | 8/13/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 195 GALLONS MUSOL SOLVENT |
Total fluid used in treatment (bbls): | 299 | Max pressure during treatment (psi): | 2439 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 3/16/2012 |
Treatment Summary: | STIMULATION WITH 4000 GALLONS 15% HCL. |
Formation Treatment |
Treatment Date: | 4/14/2010 |
Treatment Summary: | ACID STIMULATION 8-10-2009 PUMPED 4000 GALLONS OF 20% HCL THROUGH TUBING AT 5494.8'. AVERAGE 2.8 BPM @ 1845 PSI. |