| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 7/25/2025 | Treatment End Date: | N/A |
| Treatment Summary: | UIC REPAIR - REPLACED BOTH TOP AND BOTTOM LEAKING PACKERS. WITNESS MIT SCHEDULED 04/23/2024. NEW WELLBORE DIAGRAM ATTACHED. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/17/2023 | Treatment End Date: | 5/17/2023 |
| Treatment Summary: | PUMPED 95.2 BBLS 15% HCL, WITH MUTUAL SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 6/18/2008 |
| Treatment Summary: | PUMP 4200 GALS 15% HCL ACID AT 2.5 BPM 1224 PSI. |