Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/16/2023 | Treatment End Date: | 5/16/2023 |
Treatment Summary: | PUMPED 159 BBLS 15% HCL & ACROLEIN WITH MUTUAL SOLVENT AND 314 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 473 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 159 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 314 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/12/2019 | Treatment End Date: | 4/12/2019 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL, WITH 85 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 132 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 85 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/14/2015 | Treatment End Date: | 5/14/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 7/9/2008 |
Treatment Summary: | ACIDIZE W/4500 GALS HEATED 15% HCL, EOT AT 5995 TO 5775' |