Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-09243
Well Classification: ERIW Status: IJ - 5/30/2023
Well Name/No:FEE #58AX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date5/30/2023
FacilityID:231572LocationID:315791
County:RIO BLANCO #103Location:SESW 19 2N102W 6
Field:RANGELY - #72370Elevation:5330 ft.
Planned Location:848FSL  2114 FWLLat/Long: 40.123545 / -108.887966Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.123614 / -108.887760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 5/30/2023             Measured TD: 6585 ft.    Vertical TD: 6585 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 5/30/2023
Wellbore Permit
Permit #:850493 Expiration Date:8/17/1985
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/26/1985
Measured TD:6585 ft.Measured PB depth:6480 ft.
True Vertical TD:6585 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2519 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 595, Top: 0 ft., Bottom: 2519 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6585 ft., Weight: 23&26 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 4200 ft., Bottom: 6585 ft., Determination Method:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: , Bottom: 4200 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3190 ft.
MORRISON3348 ft.
ENTRADA4082 ft.
NAVAJO4285 ft.
CHINLE4896 ft.
WEBER5766 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/30/2023                 Interval Top: 5783 ft.    Interval Bottom: 6413 ft.

 Completed Information for Formation WEBER
1st Production Date:11/15/1985Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/16/2023Treatment End Date:5/16/2023
Treatment Summary:PUMPED 159 BBLS 15% HCL & ACROLEIN WITH MUTUAL SOLVENT AND 314 BBLS FRESH WATER
Total fluid used in treatment (bbls):473Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):159Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):314Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/12/2019Treatment End Date:4/12/2019
Treatment Summary:PUMPED 2000 GALLONS 15% HCL, WITH 85 BBLS FRESH WATER
Total fluid used in treatment (bbls):132Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):85Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/14/2015Treatment End Date:5/14/2015
Treatment Summary:PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):175Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/9/2008
Treatment Summary:ACIDIZE W/4500 GALS HEATED 15% HCL, EOT AT 5995 TO 5775'
Tubing Size:2.875 in.Tubing Setting Depth:5745 ft.
Tubing Packer Depth:5628 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5783 ft.# Of Holes:330
Interval Bottom:6413 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)301370
GOR
GOR DeterminationMCFE
Average BOE per Day141.262
Average MCFE per Day819.311

 Federal Financial Assurance  i 

 Tribal Well  i No