Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-09236
Well Classification: ERIW Status: IJ - 3/1/2019
Well Name/No:EMERALD #31AX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date3/1/2019
FacilityID:231565LocationID:315788
County:RIO BLANCO #103Location:NWNW 30 2N102W 6
Field:RANGELY - #72370Elevation:5342 ft.
Planned Location:654FNL  1014 FWLLat/Long: 40.119395 / -108.891906Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.119499 / -108.891701Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 3/1/2019             Measured TD: 6604 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 3/1/2019
Wellbore Permit
Permit #:10001 Expiration Date:8/24/1985
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:7/19/1985
Spud Date:4/30/1985Spud Date Is:ACTUAL
Measured TD:6604 ft.Measured PB depth:6510 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NO NEW LOGS
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2512 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 2512 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6603 ft., Weight: 23, 26 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 2370 ft., Bottom: 6603 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 4029 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 2344 ft., Bottom: 4029 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 3058 ft., Depth: 3266 ft., Bottom: 3200 ft., Sacks: 50, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
DAKOTA3127 ft.NN
MORRISON3225 ft.
ENTRADA4013 ft.NN
NAVAJO4207 ft.NN
CHINLE4825 ft.NN
WEBER5692 ft.6604 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 3/1/2019                  Interval Top: 5712 ft.    Interval Bottom: 6319 ft.

 Completed Information for Formation WEBER
1st Production Date:7/19/1985Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/18/2018Treatment End Date:10/18/2018
Treatment Summary:WELLWORK FOR CASING REPAIR. PUMP 54 BBLS 15% HCL AT 3.5 BPM @ 950 PSI WITH 60 BBLS WATER
Total fluid used in treatment (bbls):114Max pressure during treatment (psi):950
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):54Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):60Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/25/2010
Treatment Summary:ACID STIMULATION 2/25/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF COILEC TUBING 5883'. ST STARTING PRESSURE OF 1300 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:5622 ft.
Tubing Packer Depth:5534 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5712 ft.# Of Holes:148
Interval Bottom:6319 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)315536
GOR
GOR DeterminationMCFE
Average BOE per Day148.313
Average MCFE per Day860.211

 Federal Financial Assurance  i 

 Tribal Well  i No