Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/11/2021 | Treatment End Date: | 8/11/2021 |
Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/ 6% citric acid and 2.1 bbls water. |
Total fluid used in treatment (bbls): | 49 | Max pressure during treatment (psi): | 1700 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 2 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/14/2017 | Treatment End Date: | 10/14/2017 |
Treatment Summary: | Pumped 2000 gallons 15% HCl with 80 gallons mutual solvent using 167 bbls fresh water at average 1.8 bpm @ 2120 psi. |
Total fluid used in treatment (bbls): | 216 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 167 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/3/2012 | Treatment End Date: | 7/3/2012 |
Treatment Summary: | PUMP 4000 GALLONS 15% HCL AT 2.5 BPM @ 2300 PSI |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |