Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/3/2022 | Treatment End Date: | 8/3/2022 |
Treatment Summary: | Pumped 2000 Gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls water |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/1/2017 | Treatment End Date: | 12/1/2017 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AND 160 BBLS WATER |
Total fluid used in treatment (bbls): | 255 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 160 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/19/2016 | Treatment End Date: | 4/19/2016 |
Treatment Summary: | Pumped 110 gallons solvent and 2000 gallons 15% HCL, flush with 170 bbls water. |
Total fluid used in treatment (bbls): | 220 | Max pressure during treatment (psi): | 2477 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 170 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 6/28/2011 |
Treatment Summary: | RAN LINER (FORM 5 SUBMITTED) RE-PERFED, BREAKDOWN PERFS AT 3 BPM @ 1300 PSI. |