Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/13/2019 | Treatment End Date: | 9/13/2019 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 80 BBLS OF WATER. |
Total fluid used in treatment (bbls): | 127 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/11/2017 | Treatment End Date: | 5/12/2017 |
Treatment Summary: | pumped 4000 gallons 15% HCL with 140 bbls fresh water
starting 0.7 bpm @ 1400 psi |
Total fluid used in treatment (bbls): | 235 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 140 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 5/3/2012 |
Treatment Summary: | BULLHEAD 3000 GALLONS 20% HCL AT 1.0 BPM @ 1750 PSI. |
Formation Treatment |
Treatment Date: | 9/20/2010 |
Treatment Summary: | ACID STIMULATION 9-20-10 PUMPED 4000 GALLONS 20% HCL THROUGH COILED TUBING @ 60216'. |
Formation Treatment |
Treatment Date: | 9/13/1984 |
Treatment Summary: | ACID STIMULATION 2/20/06 PUMPED 3000 GALS 15% HCI THROUGH TUBING. |