Formation Treatment |
Treatment Type: | |
Treatment Date: | 6/14/2017 | Treatment End Date: | N/A |
Treatment Summary: | TUBING PLUG WAS SET AT 6,104' ON 4/4/1997
WELL WAS CONVERTED TO INJECTION ON 7/29/1985 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 3/7/2016 | Treatment End Date: | N/A |
Treatment Summary: | B/D using source water & RCN balls. Acid squeezed using 62 bbls 15% HCl & 9 RCN balls. Fraced using 2003 bbls frac fluid. 18,000 lb 100 mesh, 73,500 lbs 20/40 sand & 24 RCN balls. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |