Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/25/2023 | Treatment End Date: | 1/25/2023 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS)15% HCL W/ MUTUAL SOLVENT, 35 BBLS WATER |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 1500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/25/2022 | Treatment End Date: | 5/25/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/ MUTUAL SOLVENT, 35 BBLS WATER. |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 1350 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/11/2021 | Treatment End Date: | 3/11/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/6% CITRIC ACID AND MUTUAL SOLVENT, 40 BBLS WATER. |
Total fluid used in treatment (bbls): | 169 | Max pressure during treatment (psi): | 1550 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/15/2021 | Treatment End Date: | 2/15/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/6% CITRIC ACID AND MUTUAL SOLVENT, 66 BBLS WATER. |
Total fluid used in treatment (bbls): | 161 | Max pressure during treatment (psi): | 1600 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 66 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/29/2019 | Treatment End Date: | 6/29/2019 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 110 GALLONS (2 BBLS) PAO103 SOLVENT AND 160 BBLS OF FRESH WATER |
Total fluid used in treatment (bbls): | 157 | Max pressure during treatment (psi): | 1051 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 160 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/18/2016 | Treatment End Date: | 11/18/2016 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 30 GALLONS MUSOL SOLVENT |
Total fluid used in treatment (bbls): | 128 | Max pressure during treatment (psi): | 1560 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/22/2015 | Treatment End Date: | 10/22/2015 |
Treatment Summary: | pumped 4000 gallons 15% HCl and 80 gallons solvent |
Total fluid used in treatment (bbls): | 180 | Max pressure during treatment (psi): | 1085 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 83 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/22/2014 | Treatment End Date: | 1/22/2014 |
Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 1500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 5/21/2010 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS 20% HCL, END OF COILED TUBING @ 6481 |
Formation Treatment |
Treatment Date: | 6/11/2009 |
Treatment Summary: | ACIDIZE FORMATION W/ 4000 GALS 20% HCI, END OF COILED TUBING @ 6489'. |