Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08955
Well Classification: DSPW Status: SI - 1/1/2024
Well Name/No:EMERALD #79X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2024
FacilityID:231285LocationID:315664
County:RIO BLANCO #103Location:SESE 26 2N103W 6
Field:RANGELY - #72370Elevation:5521 ft.
Planned Location:1264FSL  1235 FELLat/Long: 40.110102 / -108.918635Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.110102 / -108.918635Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: SI - 1/1/2024             Measured TD: 6800 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        SI - 1/1/2024
Wellbore Permit
Permit #: Expiration Date:2/14/2020
Prop Depth/Form:6800 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit:Rangely Weber Unit Number:COC47675X
Formation And Spacing:Code: NAVA , Formation: NAVAJO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3009 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 925, Top: 0 ft., Bottom: 3009 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6800 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4574 ft., Bottom: 6800 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: 7 in., Top: , Depth: 4574 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 870, Top: 680 ft., Bottom: 4574 ft.

Wellbore Completed
Completion Date:5/21/1984
Spud Date:3/29/1984Spud Date Is:ACTUAL
Measured TD:6800 ft.Measured PB depth:5901 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3009 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 0 ft., Bottom: 3009 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6800 ft., Weight: 23, 26 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 4574 ft., Bottom: 6800 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 5901 ft., Depth: 6143 ft., Bottom: 6653 ft., Sacks: 130, Method: RETAINER
Additional Cement:String Type: 1ST , Top: 607 ft., Depth: 4574 ft., Bottom: 4574 ft., Sacks: 870, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
FRONTIER3242 ft.
MOWRY3510 ft.
DAKOTA3602 ft.
MORRISON3682 ft.
CURTIS4364 ft.
ENTRADA4470 ft.
CARMEL4610 ft.
NAVAJO4678 ft.
CHINLE5313 ft.
SHINARUMP5433 ft.
MOENKOPI5510 ft.
WEBER6173 ft.

Formation WEBR                     Formation Classification:  OW                     Status:  AB - 6/14/2018                 Interval Top: 6185 ft.    Interval Bottom: 6626 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/11/2018Treatment End Date:N/A
Treatment Summary:Pumped 130 sks cement across the Weber formation perforations. Set retainer at 6143, pumped 85.9 sks below retainer to a depth of 6603'. Pumped balance plug of 44.1 sks on top, tagged cement at 5948'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 998
BBLS_OIL 15
CALC_GOR 933
GRAVITY_OIL 34
MCF_GAS 14
Perforation Data:
Interval Top:6185 ft.# Of Holes:84
Interval Bottom:6626 ft.Hole Size:0.5 in.

Formation NAVA                     Formation Classification:  DSPW                     Status:  SI - 1/1/2024                  Interval Top: 4678 ft.    Interval Bottom: 5130 ft.

 Completed Information for Formation NAVAJO
1st Production Date:12/18/2018Choke Size: 
Formation Name:NAVAJOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/15/2022Treatment End Date:12/16/2022
Treatment Summary:PUMPED 3000 GALLONS (71.4 BBL) 15% HCL W/SOLVENT AND 80 BBL WATER (WELL CONVERTED TO NAVAJO FORMATION DISPOSAL WELL, First Injection 12/15/20218.)
Total fluid used in treatment (bbls):151Max pressure during treatment (psi):2000
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:4/21/2021Treatment End Date:N/A
Treatment Summary:WELL CONVERTED TO NAVAJO FORMATION DISPOSAL WELL, REPORTING FIRST INJECTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/25/2020Treatment End Date:9/25/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID AND 1.9 SOLVENT WITH 51 BBLS WATER
Total fluid used in treatment (bbls):100Max pressure during treatment (psi):1550
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):51Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/14/2018Treatment End Date:6/14/2018
Treatment Summary:WELLWORK COMPLETED TO CONVERTED WEBER FORMATION PRODUCER (PLUGBACK FORM 5A 401672760) TO A NAVAJO FORMATION WATER DISPOSAL WELL. ACIDIZE PERFORATIONS WITH 2500 GALLONS 15% HCL AND 250 BBLS BRINE WATER. NO APPROVAL FOR INJECTION, NO FIRST PRODUCTION THIS FORMATION DATE YET. COGCC WITNESSED MIT IS SCHEDULED FOR JULY 3, 2018. NO FRACTURE STIMULATION TREATMENT PLANNED AT THIS TIME.
Total fluid used in treatment (bbls):310Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):250Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:4648 ft.
Tubing Packer Depth:4583 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NAVA.
Perforation Data:
Interval Top:4678 ft.# Of Holes:377
Interval Bottom:5130 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No