|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: Status: PR - 4/1/2025 Measured TD: | Wellbore Data for Original Wellbore | Wellbore Classification: PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 111111 | Expiration Date: | 9/19/1981 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 2893 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 715, Top: 0 ft., Bottom: 2893 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6635 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 1090, Top: , Bottom: 6635 ft., Determination Method: CALC |
Formation WEBR Formation Classification: OBW Status: PR - 3/26/2025 Interval Top: 6206 ft. Interval Bottom: 6502 ft.| Completed Information for Formation WEBER | | 1st Production Date: | 1/14/1982 | Choke Size: | | | Formation Name: | WEBER | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/20/2025 | Treatment End Date: | 3/20/2025 | | Treatment Summary: | Report of well work completed: POOH w/ tbg and top pkr, TIH bit, drill out CIBP, cleanout to bottom and circulate clean, acidize perfs, TIH packer and production tbg, pressure test casing to 350 psi for 30 minutes, good test. Return well to production.
Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 55 bbls fresh water. | | Total fluid used in treatment (bbls): | 2502 | Max pressure during treatment (psi): | 1200 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 2000 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 1245 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 1/14/1982 | | Treatment Summary: | B/D using source water & RCN balls. Fraced in 5 stages using 69,700 gals. Versagel 2600, 14,000 lbs. 100 mesh sand, 72,700 lbs 20/40 sand & 28 RCN balls. (Completion Report #581583) |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6065 ft. | | Tubing Packer Depth: | 6017 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WEBR. |
| | Perforation Data: | | Interval Top: | 6206 ft. | # Of Holes: | 72 | | Interval Bottom: | 6502 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2543 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 7.831 |
| Average MCFE per Day | 45.423 |
| Federal Financial Assurance | i | |
|
|