Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08687
Well Classification: ERIW Status: SI - 7/31/2024
Well Name/No:FEE #127X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:SIStatus Date7/31/2024
FacilityID:231018LocationID:315547
County:RIO BLANCO #103Location:SENW 20 2N102W 6
Field:RANGELY - #72370Elevation:6534 ft.
Planned Location:1439FNL  1325 FWLLat/Long: 40.131865 / -108.872006Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.131860 / -108.871960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: SI - 7/31/2024             Measured TD: 6544 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        SI - 7/31/2024
Wellbore Permit
Permit #:810329 Expiration Date:7/1/1981
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:6/1/1981Spud Date Is:ACTUAL
Measured TD:6544 ft.Measured PB depth:6515 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3007 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 3007 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6544 ft., Weight: 23/26 , Citings Type: ACTUAL
Cement:Sacks: 945, Top: 0 ft., Bottom: 6544 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5964 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 5964 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: , Size: 7 in., Top: , Depth: 4750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 2450 ft., Bottom: 4750 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 967 ft., Bottom: 967 ft., Sacks: 77, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 3833 ft., Depth: 4022 ft., Bottom: 4022 ft., Sacks: 28, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
FRONTIER3063 ft.3334 ft.NN
MOWRY3334 ft.3420 ft.NN
DAKOTA3420 ft.3532 ft.NN
MORRISON3532 ft.4206 ft.NN
CURTIS4206 ft.4333 ft.NN
ENTRADA4333 ft.4460 ft.NN
CARMEL4460 ft.4510 ft.NN
NAVAJO4510 ft.5125 ft.NN
CHINLE5124 ft.
MOENKOPI5340 ft.6016 ft.NN
WEBER6016 ft.6544 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  SI - 7/31/2024                 Interval Top: 6038 ft.    Interval Bottom: 6463 ft.

 Completed Information for Formation WEBER
1st Production Date:9/29/1981Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:2/27/2025Treatment End Date:N/A
Treatment Summary:UIC Repair, attempted cmt sqz but didn't hold. Decided to just run a 5-1/2" liner from 5964'-surface, cmt'd w/ 260 sks (71.8 bbls) 13.6# cmt, circ to surface. DO cmt and float collar, pressured tested csg - good, RIH w/ injection equipment, RDMO. Return to injection pending an approved form 21.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:11/29/2022Treatment End Date:N/A
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 35 BBLS WATER
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/11/2019Treatment End Date:7/11/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 3% CITRIC ACID
Total fluid used in treatment (bbls):47Max pressure during treatment (psi):2250
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/15/2017Treatment End Date:5/15/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AND 160 BBLS FRESH WATER AT STARTING RATE OF 0.9 BPM @ 1430 PSI
Total fluid used in treatment (bbls):255Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/9/2015Treatment End Date:N/A
Treatment Summary:PUMP 165 GALLONS SOLVENT AND 4000 GALLONS 15% HCL AT 2.0 BPM
Total fluid used in treatment (bbls):279Max pressure during treatment (psi):2334
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):180Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/21/2014Treatment End Date:7/21/2014
Treatment Summary:ACID STIMULATION, PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):270Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):95Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/2/2007
Treatment Summary:ACID STIMULATION 4/2/07 PUMPED 4000 GALLONS 15% HCL THROUGH TUBING AT 6254" 6038-6463
Tubing Size:2.875 in.Tubing Setting Depth:6036 ft.
Tubing Packer Depth:5874 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6038 ft.# Of Holes:135
Interval Bottom:6463 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)110352
GOR
GOR DeterminationMCFE
Average BOE per Day52.480
Average MCFE per Day304.386

 Federal Financial Assurance  i 

 Tribal Well  i No