Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/20/2024 | Treatment End Date: | 9/20/2024 |
Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 38 bbls fresh water |
Total fluid used in treatment (bbls): | 85 | Max pressure during treatment (psi): | 2304 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/19/2023 | Treatment End Date: | 5/19/2023 |
Treatment Summary: | PUMPED 95.2 BBLS 15% HCL & INHIBITOR WITH MUTUAL SOLVENT AND 35 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2446 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/24/2019 | Treatment End Date: | 10/24/2019 |
Treatment Summary: | Wellwork to clean out wellbore, drill through CIBP and resin, reperforate, set top and bottom packers and performed acid job: (Pumped 4000 gallons (95.2 bbls) 15% HCL w/musol and 200 bbls fresh water.) |
Total fluid used in treatment (bbls): | 295 | Max pressure during treatment (psi): | 2150 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 180 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |