|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: PR - 7/1/2012 Measured TD: 6548 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: ERIW PR - 7/1/2012 | Wellbore Permit | | Permit #: | 800618 | Expiration Date: | 9/30/1980 | Proposed Depth/Form: | | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/17/1985 | Measured TD: | 6548 ft. | Measured PB depth: | 6526 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 784 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6548 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | DAKOTA | 3076 ft. | | | | ENTRADA | 3900 ft. | | | | MORRISON | 4150 ft. | | | | NAVAJO | 4150 ft. | | | | WEBER | 5626 ft. | | | |
Formation WEBR Formation Classification: OW Status: PR - 7/1/2012 Interval Top: 5636 ft. Interval Bottom: 6396 ft. Completed Information for Formation WEBER | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WEBER | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/6/2010 | Treatment Summary: | | Formation Treatment | Treatment Date: | 9/7/2010 | Treatment Summary: | JOB SCOPE- FRACTURE STIMULATE WEBER FORMATION
PUMP 220 GALLON SCW42 SCALE INHIBITIOR 5.6 BPM @ 1131 PSI
PUMP TOTAL 100,000# 16/30 SAND AT AVERAGE RATE 49 BPM @ AVERAGE PRESSURE 2670 PSI |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5429 ft. | Tubing Packer Depth: | 5389 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/6/2010 | Test Method: | VESSEL | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | RE-INJECTED | |
Test Type | Measure |
---|
BBLS_H2O | 748 | BBLS_OIL | 1 | CALC_BBLS_H2O | 748 | CALC_BBLS_OIL | 1 | CALC_GOR | 13500 | CALC_MCF_GAS | 1350 | GRAVITY_OIL | 34 | MCF_GAS | 1350 |
| Perforation Data: | Interval Top: | 5636 ft. | # Of Holes: | 0 | Interval Bottom: | 6396 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 8822 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 24.053 |
Average MCFE per Day | 139.510 |
Federal Financial Assurance | i | |
|
|