Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08316
Well Classification: GW Status: SI - 12/1/2025
Well Name/No:CANARY UNIT #6602
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 66736
Facility Status:SIStatus Date12/1/2025
FacilityID:230648LocationID:315334
County:RIO BLANCO #103Location:NENE 14 1S99W 6
Field:CANARY - #10112Elevation:6560 ft.
Basin:PICEANCE BASIN  
Planned Location:432FNL  420 FELLat/Long: 39.970370 / -108.463932Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.970451 / -108.463893Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2025             Measured TD: 10454 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2025
Wellbore Permit
Permit #:20032419 Expiration Date:1/6/2005
Proposed Depth/Form:13000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:CANARY UNIT Unit Number:66878X
Formation And Spacing:Code: MNCSB , Formation: MANCOS B , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 0 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: , Depth: 350 ft., Weight: 40.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 350 ft.
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: , Depth: 8700 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 1163, Top: , Bottom: 8700 ft.

Wellbore Completed
Completion Date:7/29/2004
Spud Date:2/23/2004Spud Date Is:ACTUAL
Measured TD:10454 ft.Measured PB depth:10360 ft.
True Vertical TD:0 ft.True Vertical PB depth:10360 ft.
Log Types:CN, CBL/GR/CCL, RSL, AI
Casing:String Type: SURF, Hole Size: 12 in., Size: 10.75 in., Top: 0 ft., Depth: 350 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 350 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: 8700 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 1163, Top: 0 ft., Bottom: 8700 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 10454 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 7728 ft., Bottom: 10454 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK5983 ft.NN
MESAVERDE6570 ft.NN
LOYD SS10390 ft.NN

Formation LOYD                     Formation Classification:  GW                     Status:  AB - 5/4/2004                  Interval Top: 10394 ft.    Interval Bottom: 10436 ft.

 Completed Information for Formation LOYD SS
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:LOYD SSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/29/2004
Treatment Summary:STAGE LLOYD: 10394-10436, 32-0.34" SHOTS, BREAKDOWN W/ 1760 GALS 7.5% HCL + 42 BIOFRAC BALLS, 2159 BBLS OF 30# HYBOR, 180300# 20-40 SAND. SET CIBP @ 10390' W/ 2 SXS CEMENT ON TOP
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:10394 ft.# Of Holes:32
Interval Bottom:10436 ft.Hole Size:0.34 in.

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 9832 ft.    Interval Bottom: 10096 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/29/2004
Treatment Summary:ACIDIZE SEGO WITH 1000 GALS 7.5% HCL & 36 3/4" 1.3 DENSITY BALLS, SET CIBP @ 9570'. LAND TBG. INSTALL PLUNGER LIFT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
MCF_GAS 0
Perforation Data:
Interval Top:9832 ft.# Of Holes:24
Interval Bottom:10096 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 8262 ft.    Interval Bottom: 8746 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/29/2004
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8628 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 70
BBLS_OIL 2
CALC_BBLS_H2O 70
CALC_BBLS_OIL 2
CALC_GOR 126
CALC_MCF_GAS 251
CASING_PRESS 843
MCF_GAS 251
TUBING_PRESS 144
Perforation Data:
Interval Top:8262 ft.# Of Holes:64
Interval Bottom:8746 ft.Hole Size:0.35 in.

Formation MVRD                     Formation Classification:  GW                     Status:  CM - 2/1/2011                  Interval Top: 6570 ft.    Interval Bottom: 8746 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:N/AChoke Size:3,264.000 in.
Formation Name:MESAVERDECommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MVRD.
No Perforation Data was found for formation MVRD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)214
Total Gas Produced (MCF)3928
GOR18355
GOR DeterminationMCFE
Average BOE per Day2.440
Average MCFE per Day14.107

 Federal Financial Assurance  i Y

 Tribal Well  i No