Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/23/2022 | Treatment End Date: | 6/23/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS ) 15% HCL WITH MUTUAL SOVENT AND 140 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 235 | Max pressure during treatment (psi): | 1000 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 140 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/23/2021 | Treatment End Date: | 3/23/2021 |
Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/ 6% Citric acid and 50 bbls water. |
Total fluid used in treatment (bbls): | 97 | Max pressure during treatment (psi): | 1200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/17/2015 | Treatment End Date: | 3/17/2015 |
Treatment Summary: | PUMPED 15% HCL |
Total fluid used in treatment (bbls): | 395 | Max pressure during treatment (psi): | 500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 300 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/4/2014 | Treatment End Date: | 6/4/2014 |
Treatment Summary: | PUMPED 15% HCL |
Total fluid used in treatment (bbls): | 245 | Max pressure during treatment (psi): | 1200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 150 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 9/14/2011 |
Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 20% HCL THROUGH TUBING @ 6648' AT STARTING PRESSURE OF 400 PSI AT A RATE OF .7 BBLS PER MINUTE |