Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08299
Well Classification: ERIW Status: IJ - 11/9/2022
Well Name/No:FEE #116X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date11/9/2022
FacilityID:230631LocationID:315323
County:RIO BLANCO #103Location:NENW 19 2N102W 6
Field:RANGELY - #72370Elevation:5356 ft.
Planned Location:1249FNL  1308 FWLLat/Long: 40.132345 / -108.890777Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.132370 / -108.890625Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 11/9/2022             Measured TD: 6610 ft.    Vertical TD: 6610 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 11/9/2022
Wellbore Permit
Permit #:840060 Expiration Date:5/23/1985
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:4/22/1985
Measured TD:6610 ft.Measured PB depth:6520 ft.
True Vertical TD:6610 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2982 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 0 ft., Bottom: 2982 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6609 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 4000 ft., Bottom: 6609 ft., Determination Method:
Casing:String Type: STAGE TOOL, Hole Size: , Size: 7 in., Top: , Depth: 4000 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 0 ft., Bottom: 4000 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3407 ft.
MORRISON3486 ft.
ENTRADA4323 ft.
NAVAJO4490 ft.
CHINLE5114 ft.
WEBER6009 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 11/9/2022                 Interval Top: 6029 ft.    Interval Bottom: 6520 ft.

 Completed Information for Formation WEBER
1st Production Date:5/5/1984Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/8/2022Treatment End Date:11/8/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH INHIBITOR AND MUTUAL SOLVENT AND 35 BBLS OF WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/21/2019Treatment End Date:9/21/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 40 BBLS OF WATER.
Total fluid used in treatment (bbls):90Max pressure during treatment (psi):2250
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):50Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/17/2017Treatment End Date:5/17/2017
Treatment Summary:Pumped 4000 gallons 15% HCL and 240 bbls water at 0.75 bpm @ 1390 psi. First injection 5/1/1985
Total fluid used in treatment (bbls):335Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):240Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/12/2015Treatment End Date:N/A
Treatment Summary:DOCUMENT PURPOSE IS TO VERIFY THE PERFORATION INTERVAL. ORIGINAL PERFORATIONS AT COMPLETION 6029-6421. WELL WORK IN APRIL 1985 ADDED PERFS AT 6445, 6498, 6512 AND 6520 WITH 3SPF.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/15/2015Treatment End Date:5/15/2015
Treatment Summary:PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):175Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/29/2008
Treatment Summary:ACIDIZE FORMATION WITH 4500 GALLONS HEATED 15% HCL, EOT @ 5961'.
Tubing Size:2.875 in.Tubing Setting Depth:6533 ft.
Tubing Packer Depth:5913 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6029 ft.# Of Holes:147
Interval Bottom:6520 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)103259
GOR
GOR DeterminationMCFE
Average BOE per Day49.595
Average MCFE per Day287.642

 Federal Financial Assurance  i 

 Tribal Well  i No