Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08294
Well Classification: ERIW Status: IJ - 1/25/2023
Well Name/No:MCLAUGHLIN, A C #69X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/25/2023
FacilityID:230626LocationID:315318
County:RIO BLANCO #103Location:SWSE 14 2N103W 6
Field:RANGELY - #72370Elevation:5470 ft.
Planned Location:135FSL  2614 FELLat/Long: 40.136135 / -108.923538Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.136233 / -108.923493Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OTH             Status: IJ - 1/25/2023             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification: OTH        IJ - 1/25/2023
Wellbore Permit
Permit #:831147 Expiration Date:1/24/1984
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:SECTOR CBL
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3001 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 0 ft., Bottom: 3001 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6716 ft., Weight: 23&26 , Citings Type: ACTUAL
Cement:Sacks: 1347, Top: 700 ft., Bottom: 6716 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: , Size: 4.5 in., Top: 0 ft., Depth: 6634 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 4800 ft., Bottom: 6634 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: 5392 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3563 ft.
MORRISON3670 ft.
ENTRADA4504 ft.
NAVAJO4670 ft.
CHINLE5311 ft.
WEBER6183 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/25/2023                 Interval Top: 6470 ft.    Interval Bottom: 6556 ft.

 Completed Information for Formation WEBER
1st Production Date:6/24/1985Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/23/2023Treatment End Date:1/23/2023
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 35 BBLS WATER
Total fluid used in treatment (bbls):83Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/14/2021Treatment End Date:12/14/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 51 BBLS WATER
Total fluid used in treatment (bbls):146Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):51Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/10/2021Treatment End Date:2/10/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6BBLS) 15% HCL/6%CITRIC ACID WITH MUTUAL SOLVENT AND 47 BBLS WATER
Total fluid used in treatment (bbls):95Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):47Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/6/2020Treatment End Date:8/6/2020
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 50 BBLS WATER
Total fluid used in treatment (bbls):145Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):50Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/11/2019Treatment End Date:6/11/2019
Treatment Summary:PUMP 4000 GALLONS 15% HCL WITH 80 BBLS OF FRESH WATER
Total fluid used in treatment (bbls):95Max pressure during treatment (psi):1800
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):15Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:7/13/2016Treatment End Date:N/A
Treatment Summary:Ran new 2 3/8" tubing and 4 1/2" packer on 3/7/2016. Discovered error on previous submitted perforation interval. 6470-6556 is the correct interval, these perforations shot after the 4 1/2" liner run in 2007.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/12/2014Treatment End Date:5/12/2014
Treatment Summary:PUMP 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):170Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):75Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/21/2013Treatment End Date:10/21/2013
Treatment Summary:PUMP 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):95Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/24/2011
Treatment Summary:PUMP 4000 GALLONS OF 20% HCL THROUGH TUBINGI AT 6580' AT .5 BPM @ 16000 PSI
Formation Treatment
Treatment Date:4/14/2010
Treatment Summary:ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCL DOWN TUBING. AT 2.8 BPM @ 2140 PSI.
Tubing Size:2.375 in.Tubing Setting Depth:6441 ft.
Tubing Packer Depth:6326 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6470 ft.# Of Holes:288
Interval Bottom:6556 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)457938
GOR
GOR DeterminationMCFE
Average BOE per Day214.390
Average MCFE per Day1243.461

 Federal Financial Assurance  i Y

 Tribal Well  i No