| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/16/2024 | Treatment End Date: | 9/16/2024 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 35 bbls Fresh water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/8/2023 | Treatment End Date: | 9/8/2023 |
| Treatment Summary: | PUMPED 95 BBLS 15% HCL W/ SOLVENT AND 45 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 140 | Max pressure during treatment (psi): | 2650 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/30/2019 | Treatment End Date: | 12/30/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL ACID WITH SOLVENT AND 147 BBLS OF FRESH WATER |
| Total fluid used in treatment (bbls): | 194 | Max pressure during treatment (psi): | 850 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 147 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 3/12/2010 |
| Treatment Summary: | ACID STIMULATION 3/12/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6562' AT STARTING PRESSURE OF 1600 PSI. |