Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/9/2012 | Treatment End Date: | 10/9/2012 |
Treatment Summary: | PUMP 3777 GALLONS 15% HCL ACROSS PERFS AT 1.O BPM @ 760 PSI. |
Total fluid used in treatment (bbls): | 133 | Max pressure during treatment (psi): | 760 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 89 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 44 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/30/2012 | Treatment End Date: | 8/30/2012 |
Treatment Summary: | PUMP 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | 1800 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 11/30/2010 |
Treatment Summary: | Acid stimulation, pumped 4000 gallons of 20% HCl through end of coiled tubing @ 6250', at starting pressure of 300psi. |