Formation Treatment |
Treatment Type: | |
Treatment Date: | 2/27/2025 | Treatment End Date: | N/A |
Treatment Summary: | WELL WAS SHUT IN 06/20/2023 FOR SUSPECTED TUBING FAILURE. Well work completed as follows. An attempt was made to fish out the SIE but fishing ops were called after only getting the top two packers. A casing leak was found from 4429-4461 and 3 cmt squeeze's were pumped to finally seal it off. Acid was used to breakdown the leak after the 2nd sqz didn't work. (1st sqz - 50 sxs 15.8# & 80 sks 13.4#, 2nd sqz - 20 sks 13.4#, 3rd sqz - 60 sks 15.8# & 20 sks 13.4#) |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/9/2012 | Treatment End Date: | 10/9/2012 |
Treatment Summary: | PUMP 3777 GALLONS 15% HCL ACROSS PERFS AT 1.O BPM @ 760 PSI. |
Total fluid used in treatment (bbls): | 133 | Max pressure during treatment (psi): | 760 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 89 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 44 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/30/2012 | Treatment End Date: | 8/30/2012 |
Treatment Summary: | PUMP 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | 1800 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 11/30/2010 |
Treatment Summary: | Acid stimulation, pumped 4000 gallons of 20% HCl through end of coiled tubing @ 6250', at starting pressure of 300psi. |