Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08035
Well Classification: ERIW Status: IJ - 7/16/2021
Well Name/No:GRAY #A-20X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date7/16/2021
FacilityID:230373LocationID:315180
County:RIO BLANCO #103Location:NESE 24 2N103W 6
Field:RANGELY - #72370Elevation:5353 ft.
Planned Location:2570FSL  125 FELLat/Long: 40.128215 / -108.895927Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.128340 / -108.895760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 7/16/2021             Measured TD: 6603 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 7/16/2021
Wellbore Permit
Permit #:10001 Expiration Date:9/30/1977
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032703A
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/25/1977
Spud Date:8/22/1977Spud Date Is:ACTUAL
Measured TD:6603 ft.Measured PB depth:6560 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 758 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 758 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.625 in., Size: 7 in., Top: 0 ft., Depth: 6603 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 3040 ft., Bottom: 6603 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5855 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 288, Top: 0 ft., Bottom: 5855 ft., Determination Method: VISU
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 794 ft., Bottom: 808 ft., Sacks: 90, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: , Depth: 4725 ft., Bottom: , Sacks: 55, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: , Depth: 4074 ft., Bottom: , Sacks: 50, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: , Depth: 5066 ft., Bottom: , Sacks: 85, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2202 ft.
FRONTIER2960 ft.
MOWRY3225 ft.
DAKOTA3314 ft.NN
MORRISON3388 ft.NN
CURTIS4088 ft.NN
ENTRADA4189 ft.NN
CARMEL4334 ft.NN
NAVAJO4392 ft.NN
CHINLE5137 ft.NN
MOENKOPI5137 ft.NN
SHINARUMP5215 ft.NN
WEBER5887 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 7/16/2021                 Interval Top: 5907 ft.    Interval Bottom: 6510 ft.

 Completed Information for Formation WEBER
1st Production Date:10/28/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/12/2021Treatment End Date:7/12/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 40 BBLS WATER
Total fluid used in treatment (bbls):87Max pressure during treatment (psi):1860
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/29/2021Treatment End Date:1/29/2021
Treatment Summary:PUMPED 114 BBLS 15% HCL AND 38 BBLS OF WATER
Total fluid used in treatment (bbls):152Max pressure during treatment (psi):902
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):114Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):38Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/28/2013Treatment End Date:10/28/2013
Treatment Summary:ACID STIMULATION WITH 4000 GALLONS 15% HCL AT 0.8 BBL PER MIN AT 1000 PSI.
Total fluid used in treatment (bbls):95Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/22/2011
Treatment Summary:ACID STIMULATION WITH 20 % HCL THROUGH END OF COILED TUBING @6493'
Formation Treatment
Treatment Date:12/18/2008
Treatment Summary:ACIDIZE FORMATION W/ 4000 GAL HEATED 15% HCL, EOT @ 5825
Tubing Size:2.875 in.Tubing Setting Depth:5864 ft.
Tubing Packer Depth:5777 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5907 ft.# Of Holes:341
Interval Bottom:6510 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)318663
GOR
GOR DeterminationMCFE
Average BOE per Day152.067
Average MCFE per Day881.986

 Federal Financial Assurance  i Y

 Tribal Well  i No