| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/19/2024 | Treatment End Date: | 11/19/2024 |
| Treatment Summary: | Pumped 47.6 bbls 15% HCL w/solvent and 34 bbls fresh water. |
| Total fluid used in treatment (bbls): | 81 | Max pressure during treatment (psi): | 2401 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 34 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/30/2019 | Treatment End Date: | 10/30/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS ) 15% HCL W/SOLVENT AND 35.0 BBLS WATER. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2250 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/13/2010 |
| Treatment Summary: | ACID STIMULATION 04/13/2010 PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF TUBING 6176' AT STARTING PRESSURE OF 1200 PSI. |