Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08030
Well Classification: ERIW Status: IJ - 1/30/2023
Well Name/No:UNION PACIFIC #104X-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/30/2023
FacilityID:230368LocationID:315176
County:RIO BLANCO #103Location:SESW 20 2N102W 6
Field:RANGELY - #72370Elevation:5277 ft.
Planned Location:1299FSL  1474 FWLLat/Long: 40.124845 / -108.871526Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.124880 / -108.871430Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 1/30/2023             Measured TD: 6527 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 1/30/2023
Wellbore Permit
Permit #:10001 Expiration Date:9/30/1977
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:6/7/1977Spud Date Is:ACTUAL
Measured TD:6527 ft.Measured PB depth:6511 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 13 in., Size: 9.625 in., Top: 0 ft., Depth: 784 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 784 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 784 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6526 ft., Weight: 23/26 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 6526 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6526 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 3951 ft., Depth: 3951 ft., Bottom: 4594 ft., Sacks: 245, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4692 ft., Depth: , Bottom: 5179 ft., Sacks: 100, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4594 ft., Depth: , Bottom: 4692 ft., Sacks: 45, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA1970 ft.2146 ft.NN
FRONTIER2890 ft.2971 ft.NN
MOWRY3162 ft.3252 ft.NN
DAKOTA3252 ft.3326 ft.NN
MORRISON3326 ft.4040 ft.NN
CURTIS4040 ft.4152 ft.NN
ENTRADA4152 ft.4285 ft.NN
CARMEL4285 ft.4332 ft.NN
NAVAJO4332 ft.4943 ft.NN
CHINLE4943 ft.5068 ft.NN
SHINARUMP5068 ft.5157 ft.NN
MOENKOPI5157 ft.5818 ft.NN
WEBER5818 ft.6436 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/30/2023                 Interval Top: 5831 ft.    Interval Bottom: 6436 ft.

 Completed Information for Formation WEBER
1st Production Date:8/9/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/21/2023Treatment End Date:N/A
Treatment Summary:WELLWORK TO Rig up and release 7” hydroseal packer. Lay down injection tubing and cleanout to fishtop at 5,754’. Isolate a casing leak from 3951 – 4668’. Run CBL and CIL from 5710’ to surface.  Set CICR at 3951’ and squeeze with 245 sxs of Class G cement. Drill out CICR and cement and begin fishing downhole injection packer and mandrel system.  Fish equipment down to 6,183’ from 4/6/22 to 5/13/22.  Acidize perforations with 4,000 gals of 15% HCL/6% Citric Acid. Run and set new 7” Lokset packer at 5703’ with end of tailpipe at 5740’. Isolate casing leak to two intervals from 4,594’-4,692’ and 4,952’ – 5,179’. Squeeze lower interval with 100 sxs Finecem cement and upper interval with 45 sxs Finecem cement.  Drill out cement and perform successful pressure test to 1,300 psi.  Clean out to top of Lokset packer and then run new 7” AS1X packer and 2-7/8” DBB Fiberlined tubing.  WELL TO BE RETURNED TO ACTIVE INJECTION UPON APPROVAL OF FORM 21.
Total fluid used in treatment (bbls):95Max pressure during treatment (psi):1800
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/26/2023Treatment End Date:1/26/2023
Treatment Summary:Pumped 4000 gallons (95.2 bbl) 15% HCL w/ solvent and inhibitor and 35 bbl fresh water.
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/29/2017Treatment End Date:12/2/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 370 BBLS WATER
Total fluid used in treatment (bbls):465Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):370Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/26/2012
Treatment Summary:PUMP 3000 GALLONS 20% HCL ACROSS PERFS AT .03BPM @ 2300 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:5739 ft.
Tubing Packer Depth:5651 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5831 ft.# Of Holes:267
Interval Bottom:6436 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)77212
GOR
GOR DeterminationMCFE
Average BOE per Day36.486
Average MCFE per Day211.609

 Federal Financial Assurance  i 

 Tribal Well  i No