| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/11/2025 | Treatment End Date: | 2/11/2025 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 150 bbls fresh water. |
| Total fluid used in treatment (bbls): | 245 | Max pressure during treatment (psi): | 1500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 100 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 150 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/17/2024 | Treatment End Date: | 9/17/2024 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls fresh water |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 9/21/2023 | Treatment End Date: | N/A |
| Treatment Summary: | WELLWORK TO Rig up and release 7” hydroseal packer. Lay down injection tubing and cleanout to fishtop at 5,754’. Isolate a casing leak from 3951 – 4668’. Run CBL and CIL from 5710’ to surface. Set CICR at 3951’ and squeeze with 245 sxs of Class G cement. Drill out CICR and cement and begin fishing downhole injection packer and mandrel system. Fish equipment down to 6,183’ from 4/6/22 to 5/13/22. Acidize perforations with 4,000 gals of 15% HCL/6% Citric Acid. Run and set new 7” Lokset packer at 5703’ with end of tailpipe at 5740’. Isolate casing leak to two intervals from 4,594’-4,692’ and 4,952’ – 5,179’. Squeeze lower interval with 100 sxs Finecem cement and upper interval with 45 sxs Finecem cement. Drill out cement and perform successful pressure test to 1,300 psi. Clean out to top of Lokset packer and then run new 7” AS1X packer and 2-7/8” DBB Fiberlined tubing. WELL TO BE RETURNED TO ACTIVE INJECTION UPON APPROVAL OF FORM 21. |
| Total fluid used in treatment (bbls): | 95 | Max pressure during treatment (psi): | 1800 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 1/26/2023 | Treatment End Date: | 1/26/2023 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbl) 15% HCL w/ solvent and inhibitor and 35 bbl fresh water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/29/2017 | Treatment End Date: | 12/2/2017 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 370 BBLS WATER |
| Total fluid used in treatment (bbls): | 465 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 370 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/26/2012 |
| Treatment Summary: | PUMP 3000 GALLONS 20% HCL ACROSS PERFS AT .03BPM @ 2300 PSI. |