| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/14/2025 | Treatment End Date: | 11/14/2025 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/16/2025 | Treatment End Date: | 4/16/2025 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 35 bbls fresh water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/5/2023 | Treatment End Date: | 9/5/2023 |
| Treatment Summary: | PUMPED 95.2 BBLS 15% HCL W/ SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/2/2017 | Treatment End Date: | 8/2/2017 |
| Treatment Summary: | pumped 2000 gallons 15% HCl and 110 gallons solvent with 183 bbls water |
| Total fluid used in treatment (bbls): | 233 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 183 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 10/13/2015 | Treatment End Date: | N/A |
| Treatment Summary: | This document purpose to correct the perforation interval. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 6/10/2010 |
| Treatment Summary: | ACID STIMULATION 6/10/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6043' AT STARTING PRESSURE OF 2200 PSI. |