| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 8/21/2025 | Treatment End Date: | N/A |
| Treatment Summary: | UIC Repair - Well work to isolate and repair casing leak, squeezed from 2717 feet - 2783 feet with 50 sxs of 15.8 Premium G Cement 1.15 yield, replace packers and tubing. Operations summary, cement report and wellbore diagram attached. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/8/2023 | Treatment End Date: | 9/8/2023 |
| Treatment Summary: | PUMPED 95.2 BBLS 15% HCL WITH SOLVENT AND 47 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 142 | Max pressure during treatment (psi): | 2484 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/28/2022 | Treatment End Date: | 6/28/2022 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 120 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 215 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 120 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 7/14/2009 |
| Treatment Summary: | ACID STIMULATION 7-14-0 PUMPED 4000 GALLONS 20% HCL @4 BPM 2300PSI EOT 6463.85'. |