| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/19/2025 | Treatment End Date: | 2/19/2025 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/23/2024 | Treatment End Date: | 8/23/2024 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 35 bbls fresh water |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 7/1/2011 |
| Treatment Summary: | ACID STIMULATION - PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF TUBING AT 5810' AT STARTING PRESSURE OF 1 BPM @ 1200 PSI |