Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07949
Well Classification: ERIW Status: IJ - 7/1/2021
Well Name/No:HAGOOD L N #A-11X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date7/1/2021
FacilityID:230289LocationID:315122
County:RIO BLANCO #103Location:SWNE 23 2N103W 6
Field:RANGELY - #72370Elevation:5518 ft.
Planned Location:2587FNL  2636 FELLat/Long: 40.128675 / -108.923658Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.128765 / -108.923601Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 7/1/2021             Measured TD: 6769 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 7/1/2021
Wellbore Permit
Permit #:10001 Expiration Date:5/24/1977
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-033586
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:4/17/1977
Spud Date:3/24/1977Spud Date Is:ACTUAL
Measured TD:6769 ft.Measured PB depth:6750 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:CEMENT BOND LOG RUN 8/30/2011 SUBMITTED WITH FORM 21 DATED 9/6/2011
Log Types:
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 761 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 761 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6767 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 2855 ft., Bottom: 6767 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6035 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 344, Top: 0 ft., Bottom: 6035 ft., Determination Method: VISU
Additional Cement:String Type: 1ST , Top: 3828 ft., Depth: 2780 ft., Bottom: 3966 ft., Sacks: 70, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 3800 ft., Depth: 4385 ft., Bottom: 4370 ft., Sacks: 110, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 3742 ft., Depth: 4088 ft., Bottom: 4217 ft., Sacks: 100, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4179 ft., Depth: 4379 ft., Bottom: 4379 ft., Sacks: 40, Method:
Additional Cement:String Type: 2ND , Top: 3788 ft., Depth: 4001 ft., Bottom: 4001 ft., Sacks: 70, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
DAKOTA3532 ft.NN
MORRISON3629 ft.NN
CURTIS4334 ft.NN
ENTRADA4434 ft.NN
CARMEL4562 ft.NN
NAVAJO4621 ft.NN
CHINLE5247 ft.NN
MOENKOPI5330 ft.
SHINARUMP5360 ft.NN
WEBER6110 ft.6769 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 7/1/2021                  Interval Top: 6118 ft.    Interval Bottom: 6734 ft.

 Completed Information for Formation WEBER
1st Production Date:6/16/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/13/2020Treatment End Date:5/13/2020
Treatment Summary:WELLWORK TO REPAIR CASING, INSTALLED 5 1/2" J-55, K-55 & L-80 LINER 0' - 6035' DOCUMENT# 402406018. WELL TO BE RETURNED TO ACTIVE PRODUCTION PENDING APPROVAL OF FORM 21. MIT SCHEDULED FOR 5/21/2020. ACID JOB : PUMPED 4746 GALLONS (113 bbls) 15% HCL with 214 BBLS FRESH WATER
Total fluid used in treatment (bbls):327Max pressure during treatment (psi):1700
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):113Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):214Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/15/2009
Treatment Summary:ACIDIZE FORMATION W/ 4000 GALS HEATED 20% HCI @ 5.8 BPM 2049 PSI
Tubing Size:2.375 in.Tubing Setting Depth:6040 ft.
Tubing Packer Depth:5953 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6118 ft.# Of Holes:780
Interval Bottom:6734 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)316939
GOR
GOR DeterminationMCFE
Average BOE per Day147.260
Average MCFE per Day854.136

 Federal Financial Assurance  i Y

 Tribal Well  i No