Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/12/2022 | Treatment End Date: | 12/12/2022 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBL) 15% HCL W/ MUTUAL SOLVENT AND 140 BBL WATER |
Total fluid used in treatment (bbls): | 187 | Max pressure during treatment (psi): | 1750 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 140 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/30/2019 | Treatment End Date: | 9/30/2019 |
Treatment Summary: | PUMPED 2604 GALLONS (62 BBLS) 15% HCL WITH SOLVENT AND 123 BBLS WATER. |
Total fluid used in treatment (bbls): | 185 | Max pressure during treatment (psi): | 1255 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 62 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 123 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/5/2017 | Treatment End Date: | 8/5/2017 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AND 80 BBLS WATER. WELL PLACED ON INJECTION 9/11/1984 |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/16/2013 | Treatment End Date: | 8/16/2013 |
Treatment Summary: | PUMP 15% HCL |
Total fluid used in treatment (bbls): | 95 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 8/19/2009 |
Treatment Summary: | ACID STIMULATION 8/19/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 IN 4 STAGES THROUGH TUBING AT 6606'. |