| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/30/2025 | Treatment End Date: | 7/31/2025 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 150 bbls fresh water, recycle 60 bbls fresh water. |
| Total fluid used in treatment (bbls): | 197 | Max pressure during treatment (psi): | 1600 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 60 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 150 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/8/2023 | Treatment End Date: | 9/8/2023 |
| Treatment Summary: | PUMPED 47.6 BBLS 15% HCL W/SOLVENT AND 72 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 119 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 72 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/30/2021 | Treatment End Date: | 6/30/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 40 BBLS WATER
|
| Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2100 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/9/2019 | Treatment End Date: | 7/9/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL w/ 3% CITRIC ACID AND 90 BBLS WATER. |
| Total fluid used in treatment (bbls): | 137 | Max pressure during treatment (psi): | 2273 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 5/4/2012 |
| Treatment Summary: | BULLHEAD 3000 GALLONS OF 20% HCL AT 0.3 BPM @ 200 PSI. |
| Formation Treatment |
| Treatment Date: | 4/1/2011 |
| Treatment Summary: | ACID STIMULATION 4/1/11 WITH 3000 GALLONS OF 20% HCL THROUGH COILED TUBING WASH TIP AT 6370' AT .8 BPM @ 2000 PSI. |
| Formation Treatment |
| Treatment Date: | 2/8/2010 |
| Treatment Summary: | ACID STIMULATION 2/8/2010 PUMPED 4000 GALS 20% HCI THROUGH COILED TUBING WASH TIP AT 6354' 1BPM @ 3500 PSI. |