Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07690
Well Classification: OBW Status: AC - 6/1/2023
Well Name/No:A C MCLAUGHLIN #61X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:ACStatus Date6/1/2023
FacilityID:230031LocationID:314985
County:RIO BLANCO #103Location:SESW 13 2N103W 6
Field:RANGELY - #72370Elevation:5481 ft.
Planned Location:1229FSL  2617 FWLLat/Long: 40.139135 / -108.904827Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.139200 / -108.904780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AC - 6/1/2023             Measured TD: 6642 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AC - 6/1/2023
Wellbore Permit
Permit #:750145 Expiration Date:6/20/1975
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 20, Drill Unit:

Wellbore Completed
Completion Date:1/24/1980
Spud Date:3/24/1975Spud Date Is:ACTUAL
Measured TD:6642 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 750 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 750 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6618 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 3500 ft., Bottom: 6618 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
DAKOTA3653 ft.
MORRISON3757 ft.
CURTIS4440 ft.
ENTRADA4550 ft.
CARMEL4691 ft.
NAVAJO4742 ft.
CHINLE5373 ft.
WEBER6270 ft.

Formation WEBR                     Formation Classification:  OBW                     Status:  AC - 6/1/2023                  Interval Top: 6275 ft.    Interval Bottom: 6642 ft.

 Completed Information for Formation WEBER
1st Production Date:5/28/1975Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:11/18/2019Treatment End Date:N/A
Treatment Summary:TUBING PLUG SET AT 6250'. WELL HAS PERFORMATION INTERVAL 6275-6618' AND OPEN HOLE INTERVAL 6618-6642.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:5/4/2017Treatment End Date:N/A
Treatment Summary:TUBING PULL SET DURING WORKOVER TO TA WELL - NO WIRELINE REPORT - SET AT 6240' WELL HAS PERFORATION INTERVAL 6275-6618' AND OPEN HOLE INTERVAL 6618-6642'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/30/2016Treatment End Date:N/A
Treatment Summary:PULLED PUMP AND RAN ISOLATION PACKER OPEN HOLE INTERVAL 6618-6642'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6255 ft.
Tubing Packer Depth:6244 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2926
BBLS_OIL 444
CALC_GOR 21
GRAVITY_OIL 34
MCF_GAS 9
Perforation Data:
Interval Top:6275 ft.# Of Holes:154
Interval Bottom:6642 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No