Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07599
Well Classification: ERIW Status: IJ - 11/24/2025
Well Name/No:UNION PACIFIC "B" #5X-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date11/24/2025
FacilityID:229940LocationID:314948
County:RIO BLANCO #103Location:NWSW 34 2N102W 6
Field:RANGELY - #72370Elevation:5321 ft.
Basin:PICEANCE BASIN  
Planned Location:1401FSL  1279 FWLLat/Long: 40.096036 / -108.834084Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.096147 / -108.834316Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 11/24/2025             Measured TD: 6479 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 11/24/2025
Wellbore Permit
Permit #:10001 Expiration Date:5/11/1974
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:5/9/1974Spud Date Is:ACTUAL
Measured TD:6479 ft.Measured PB depth:6465 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:CBL attached
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 764 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 764 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6479 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 6479 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5586 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 5586 ft., Determination Method: CBL
Additional Cement:String Type: 1ST LINER , Top: 0 ft., Depth: 5586 ft., Bottom: 5586 ft., Sacks: 255, Method: SQUEEZE
Additional Cement:String Type: 1ST LINER , Top: 3870 ft., Depth: 3807 ft., Bottom: 3903 ft., Sacks: 50, Method: RETAINER
FormationInterval TopLog BottomCoredDSTs
FRONTIER2797 ft.3064 ft.NN
MOWRY3064 ft.3170 ft.NN
DAKOTA3170 ft.3253 ft.NN
MORRISON3253 ft.3917 ft.NN
CURTIS3917 ft.4030 ft.NN
ENTRADA4030 ft.4158 ft.NN
CARMEL4158 ft.4209 ft.NN
NAVAJO4209 ft.4780 ft.NN
CHINLE4780 ft.4915 ft.NN
SHINARUMP4915 ft.4984 ft.NN
MOENKOPI4984 ft.5635 ft.NN
WEBER5635 ft.6579 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 11/24/2025                Interval Top: 5640 ft.    Interval Bottom: 6444 ft.

 Completed Information for Formation WEBER
1st Production Date:11/14/1974Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/20/2025Treatment End Date:11/20/2025
Treatment Summary:PUMPED 2000 GALLON (47.6 BBLS) 15% HCL W/SOLVENT AND 34 BBLS FRESH WATER.
Total fluid used in treatment (bbls):81Max pressure during treatment (psi):2476
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):34Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/5/2025Treatment End Date:N/A
Treatment Summary:UIC Repair - POOH w/ top pkr, CO well and test csg - failed, isolate leak interval fr/ 3870'-3903', notified ECMC of cmt sqz plans, sqz'd leak - didn't hold, decision made to run 5.5" liner, PU RIH w/ 5.5" 17# j-55 liner from surface to 5586', cmt w/ 255 sks 13.6# premium class G cmt - 13.4 bbls cmt circ to surface, DO FC, cmt, and shoe, run CBL - cmt to surface, chart test csg - good, RIH w/ top and btm pkr on FL inj tbg and RDMO. Return to injection pending an approved Form 21.
Total fluid used in treatment (bbls):3720Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):2727Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3130Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:10/7/2019Treatment End Date:N/A
Treatment Summary:TUBING PLUG WAS SET AT 5558' ON 9/17/2019.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/18/2007
Treatment Summary:ACIDIZE FORMATION WITH 8000 GALLONS 15% HCI, EOT @ 5557' AT .7 BPM @ 1230 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:5618 ft.
Tubing Packer Depth:5558 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5640 ft.# Of Holes:298
Interval Bottom:6444 ft.Hole Size:0.5 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No