| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/20/2024 | Treatment End Date: | 3/20/2024 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 90 bbls fresh water. |
| Total fluid used in treatment (bbls): | 185 | Max pressure during treatment (psi): | 1900 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/25/2020 | Treatment End Date: | 2/25/2020 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID |
| Total fluid used in treatment (bbls): | 47 | Max pressure during treatment (psi): | 1100 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 2/11/2010 |
| Treatment Summary: | ACID STIMULATION 02/11/2010 PUMPED 4000 GALLONS 20% HCI THROUGH COILED TUBING 6331, STARTING PRESSURE 1500 PSI. |