| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/18/2024 | Treatment End Date: | 10/18/2024 |
| Treatment Summary: | Pumped 2000 Gallons (47.6 bbls) 15% HCL w/solvent and 34 bbls Fresh water. |
| Total fluid used in treatment (bbls): | 81 | Max pressure during treatment (psi): | 2100 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 34 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/29/2024 | Treatment End Date: | 3/29/2024 |
| Treatment Summary: | 3/8/24-4/8/24 UIC Repair, attempted to fish out SIE down to W5. Called off fishing ops due to cost. Found csg leak at 5125-5158, unable to est inj rate, spotted acid across, got .6 BPM @ 2900 psi, pumped cmt sqz (pmp'd 50 sk balance plug of 13.4# premium G cmt, PUH and set pkr and able to sqz 1 bbl total into leak) , DO cmt, tst'd csg - good, RBIH w/ two pkr injection setup. RWTI pending an approved Form 21.
|
| Total fluid used in treatment (bbls): | 18205 | Max pressure during treatment (psi): | 2900 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 8 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 16680 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 9704 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 12/7/2017 | Treatment End Date: | N/A |
| Treatment Summary: | COA for document #401276922, correct tubing depth.
EOT is 6505.45' |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 1/23/2017 | Treatment End Date: | N/A |
| Treatment Summary: | CORRECTION TO THE TUBING AND PACKER DEPTH REPORTED ON THE FORM 21 DATED 4/10/2013 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |