| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/27/2024 | Treatment End Date: | 3/27/2024 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 37 bbls fresh water. |
| Total fluid used in treatment (bbls): | 132 | Max pressure during treatment (psi): | 2436 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 37 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/23/2019 | Treatment End Date: | 4/23/2019 |
| Treatment Summary: | PUMPED 15% HCL WITH 2000 GALLONS OF SOLVENT, 6000 gallons of mutual solvent, 80 BBLS OF WATER |
| Total fluid used in treatment (bbls): | 152 | Max pressure during treatment (psi): | 2250 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 80 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/11/2015 | Treatment End Date: | 8/11/2015 |
| Treatment Summary: | Pumped 4000 gallons 15% HCl with 165 gallons Musol solvent |
| Total fluid used in treatment (bbls): | 299 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/29/2012 | Treatment End Date: | 6/29/2012 |
| Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 15% HCL |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 71 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |