Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/23/2022 | Treatment End Date: | 5/23/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ MUTUAL SOLVENT AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/19/2022 | Treatment End Date: | 1/19/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ MUTUAL SOLVENT AND 72 BBLS WATER |
Total fluid used in treatment (bbls): | 167 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 72 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/14/2015 | Treatment End Date: | 11/14/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AND 245 GALLONS MUTUAL SOLVENT |
Total fluid used in treatment (bbls): | 301 | Max pressure during treatment (psi): | 2281 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 8/16/2010 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS 20% HCL, AND OF COILED TUBING @ 6447. |
Formation Treatment |
Treatment Date: | 5/3/2007 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS 15% HCI,EOT @ 5645' |