Wellbore #00 Wellbore Classification: ERIW Status: IJ - 12/1/2019 Measured TD: 6460 ft. Wellbore Data for Original Wellbore | Wellbore Classification: ERIW IJ - 12/1/2019 | Wellbore Permit | | Permit #: | 730285 | Expiration Date: | 9/10/1973 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEDERAL | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 11/7/2000 | Spud Date: | 5/20/1973 | Spud Date Is: | ACTUAL | Measured TD: | 6460 ft. | Measured PB depth: | 6440 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL 1/20/17 | Casing: | String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 761 ft., Weight: 40.5 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 761 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6459 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 0 ft., Bottom: 6459 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5678 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 5678 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 2740 ft., Depth: 2832 ft., Bottom: 2832 ft., Sacks: 100, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 1823 ft., Depth: 2227 ft., Bottom: 2227 ft., Sacks: 250, Method: SQUEEZE | Additional Cement: | String Type: S.C. 1.1 , Top: 2740 ft., Depth: 2832 ft., Bottom: 2832 ft., Sacks: 100, Method: SQUEEZE | Additional Cement: | String Type: S.C. 1.2 , Top: 1823 ft., Depth: 2211 ft., Bottom: 2211 ft., Sacks: 150, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | DAKOTA | 3262 ft. | | | | MORRISON | 3340 ft. | | | | CURTIS | 3950 ft. | | | | ENTRADA | 4068 ft. | | | | CARMEL | 4212 ft. | | | | NAVAJO | 4270 ft. | | | | CHINLE | 4845 ft. | | | | SHINARUMP | 4970 ft. | | | | MOENKOPI | 5060 ft. | | | | WEBER | 5703 ft. | | N | N |
Formation WEBR Formation Classification: ERIW Status: IJ - 12/1/2019 Interval Top: 5726 ft. Interval Bottom: 6413 ft. Completed Information for Formation WEBER | 1st Production Date: | 11/9/2000 | Choke Size: | | Formation Name: | WEBER | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/9/2017 | Treatment End Date: | N/A | Treatment Summary: |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 8/10/2009 | Treatment Summary: | ACID STIMULATION 8/10/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 IN 4 STAGES THROUGH TUBING @ 6178'. AVERAGE 3.4 BPM@ 238 PSI. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5639 ft. | Tubing Packer Depth: | 5547 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 28 | BBLS_OIL | 459 | CALC_GOR | 14 | GRAVITY_OIL | 34 | MCF_GAS | 6 |
| Perforation Data: | Interval Top: | 5726 ft. | # Of Holes: | 123 | Interval Bottom: | 6413 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 6784 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 3.200 |
Average MCFE per Day | 18.568 |
Federal Financial Assurance | i | Y |
|
|