Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/22/2020 | Treatment End Date: | 6/22/2020 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 50 BBLS WATER.
|
Total fluid used in treatment (bbls): | 97 | Max pressure during treatment (psi): | 2270 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 7/27/2017 | Treatment End Date: | N/A |
Treatment Summary: | PULL AND REPLACE TUBING AND PACKER. WELL WAS CONVERTED TO INJECTION 1/15/1988 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/29/2014 | Treatment End Date: | 10/29/2014 |
Treatment Summary: | ACID STIMULATION WITH 15% HCL |
Total fluid used in treatment (bbls): | 219 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 124 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/27/2012 | Treatment End Date: | 9/27/2012 |
Treatment Summary: | ACID STIMULATION WITH 20% HCL |
Total fluid used in treatment (bbls): | 295 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 10/17/2011 |
Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS OF 20% HCL THROUGH END OF COILED TUBING AT 6217' AT 1000PSI |
Formation Treatment |
Treatment Date: | 2/17/2010 |
Treatment Summary: | ACID STIMULATION 2/17/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6235.' AT STARTING PRESSURE OF 1500 PSI. |