Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06425
Well Classification: ERIW Status: IJ - 12/3/2025
Well Name/No:MCLAUGHLIN, A C #52X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/3/2025
FacilityID:229324LocationID:314698
County:RIO BLANCO #103Location:SWNW 23 2N103W 6
Field:RANGELY - #72370Elevation:5504 ft.
Basin:PICEANCE BASIN  
Planned Location:1320FNL  1220 FWLLat/Long: 40.132145 / -108.928618Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.132266 / -108.928670Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 12/3/2025             Measured TD: 6700 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 12/3/2025
Wellbore Permit
Permit #:660263 Expiration Date:4/10/1980
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:7/22/1966
Spud Date:7/20/1966Spud Date Is:ACTUAL
Measured TD:6700 ft.Measured PB depth:6680 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:LOGS PREVIOUSLY SUBMITTED
Log Types:
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 721 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 721 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9 in., Size: 7 in., Top: 0 ft., Depth: 6180 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 0 ft., Bottom: 6180 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 6097 ft., Depth: 6699 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 6097 ft., Bottom: 6699 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FRONTIER3236 ft.3504 ft.NN
MOWRY3504 ft.3584 ft.NN
DAKOTA3584 ft.3698 ft.NN
MORRISON3698 ft.4380 ft.NN
CURTIS4380 ft.4480 ft.NN
ENTRADA4480 ft.4622 ft.NN
CARMEL4622 ft.4680 ft.NN
NAVAJO4680 ft.5310 ft.NN
CHINLE5310 ft.5420 ft.NN
SHINARUMP5420 ft.5503 ft.NN
MOENKOPI5503 ft.6175 ft.NN
WEBER6175 ft.6700 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/3/2025                 Interval Top: 6197 ft.    Interval Bottom: 6640 ft.

 Completed Information for Formation WEBER
1st Production Date:5/19/1986Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/2/2025Treatment End Date:12/2/2025
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/23/2025Treatment End Date:6/23/2025
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 60 BBLS FRESH WATER.
Total fluid used in treatment (bbls):155Max pressure during treatment (psi):1700
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):60Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/17/2024Treatment End Date:5/17/2024
Treatment Summary:PUPMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 70 BBLS FRESH WATER.
Total fluid used in treatment (bbls):118Max pressure during treatment (psi):2600
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/7/2023Treatment End Date:8/7/2023
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/inhibitor and 40 bbls fresh water
Total fluid used in treatment (bbls):88Max pressure during treatment (psi):2487
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/2/2022Treatment End Date:8/2/2022
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL with mutual solvent and 35 bbls water.
Total fluid used in treatment (bbls):83Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/18/2021Treatment End Date:8/18/2021
Treatment Summary:PUMPED 2000 GALLONS 47.6 BBLS 15% HCL W/6% CITRIC ACID AND 120 BBLS WATER
Total fluid used in treatment (bbls):167Max pressure during treatment (psi):1950
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):120Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/16/2020Treatment End Date:9/17/2020
Treatment Summary:PUMPED 2000 GALLONS 47.6 BBLS 15% HCL W/6% CITRIC ACID AND 80 BBLS POTABLE WATER
Total fluid used in treatment (bbls):127Max pressure during treatment (psi):1900
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/2/2019Treatment End Date:2/2/2019
Treatment Summary:ACID STIMULATION WITH 2000 GALLONS 15% HCL, 30 BBLS SOLVENT AND 105 BBLS FRESH WATER. STARTING AT 4.0 BPM AT 2140 PSI.
Total fluid used in treatment (bbls):183Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):105Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/16/2017Treatment End Date:8/16/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 155 GALLONS ADDITIVES, 160 BBLS WATER
Total fluid used in treatment (bbls):259Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/12/2012
Treatment Summary:ACID STIMULATION WITH 4000 GALLONS 15% HCL
Formation Treatment
Treatment Date:3/29/2011
Treatment Summary:ACID STIMULATION 3/29/2011 PUMPED 3100 GALLONS 20% HCL THROUGH COILED TUBING AT 6186' @ .5 BBLS PER MIN AT A MAX PRESSURE OF 1800 PSI.
Formation Treatment
Treatment Date:8/7/2009
Treatment Summary:ACID STIMULATION 8/7/09 PUMPED 2000 GALS 20% HCI 10,500 GALS CHLORINE DIOXIDE IN FOUR STAGES THROUGH TUBING AT 6660.0 AVERAGE 4.2 BPM @ 2216 PSI
Tubing Size:2.875 in.Tubing Setting Depth:6660 ft.
Tubing Packer Depth:5967 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6197 ft.# Of Holes:87
Interval Bottom:6640 ft.Hole Size:0.5 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No