|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2022 Measured TD: 6486 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2022 | Wellbore Permit | | Permit #: | 100001 | Expiration Date: | 2/24/2000 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 2/11/1967 | Spud Date: | 1/3/1967 | Spud Date Is: | ACTUAL | Measured TD: | 6486 ft. | Measured PB depth: | 6467 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | 3/22/2019 RADIAL CEMENT BOND | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 700 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.813 in., Size: 5.5 in., Top: 0 ft., Depth: 6485 ft., Weight: 14 , Citings Type: ACTUAL | Cement: | Sacks: 1025, Top: , Bottom: , Determination Method: CALC | Additional Cement: | String Type: 1ST , Top: 4381 ft., Depth: 4930 ft., Bottom: 4738 ft., Sacks: 50, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 4544 ft., Depth: , Bottom: , Sacks: 28, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | DAKOTA | 3547 ft. | | N | N | MORRISON | 3640 ft. | | N | N | CURTIS | 4256 ft. | | N | N | NAVAJO | 4570 ft. | | N | N | SHINARUMP | 5301 ft. | | N | N | MOENKOPI | 5445 ft. | | N | N | WEBER | 6052 ft. | 6486 ft. | N | N |
Formation WEBR Formation Classification: OW Status: PR - 1/1/2022 Interval Top: 6055 ft. Interval Bottom: 6446 ft. Completed Information for Formation WEBER | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WEBER | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/3/2008 | Treatment Summary: | WELL WAS CLEANED OUT, PERFORATIONS ADDED, ACIDIZED WITH 8000 GALLONS HEATED 15% HCL WITH ADDITIVES THRU END OF TUBING AT 5794'. WELL LEFT SHUT-IN WAITING ON FACILITIES. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5979 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 1237 | BBLS_OIL | 101 | CALC_BBLS_H2O | 1237 | CALC_BBLS_OIL | 101 | CALC_GOR | 3228 | CALC_MCF_GAS | 326 | GRAVITY_OIL | 34 | MCF_GAS | 326 |
| Perforation Data: | Interval Top: | 6055 ft. | # Of Holes: | 90 | Interval Bottom: | 6446 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2117 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 5.793 |
Average MCFE per Day | 33.599 |
Federal Financial Assurance | i | Y |
|
|