Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/11/2024 | Treatment End Date: | 11/11/2024 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2143 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/8/2023 | Treatment End Date: | 8/8/2023 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/INHIBITOR AND 47 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 142 | Max pressure during treatment (psi): | 1852 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 7/20/2023 | Treatment End Date: | N/A |
Treatment Summary: | Rigged up. Released PS1X packer and laid down injection tubing and PS1X packer. Cleaned out to top of Loc-set packer. Release and pull Loc-set packer. Drill out fiberglass tailpipe and clean out to PBTD at 6,640’. Run in hole and set 7” loc-set packer @ 6,249’. Perform successful preliminary pressure test to 1,250 psi. Run 7” PS1X packer and 2-7/8” DYB Fiberglass tubing. Successfully test tubing to 2,500 psi and casing to 1,300 psi. Witness MIT scheduled for 6/1/22. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 12/30/2021 | Treatment End Date: | N/A |
Treatment Summary: | Pulled the tubing and top packer, cleaning out to the bottom packer, run a new top packer and tubing, and stripping on a TM-40 spool instead of a full wellhead upgrade. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/17/2021 | Treatment End Date: | 6/17/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 bbls) 15% HCL, WITH 6% CITRIC AND INHIBITOR AND 40 BBLS FRESH WATER.
CONVERTED TO WATER INJECTION 03/15/1974 |
Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 2250 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/2/2019 | Treatment End Date: | 2/2/2019 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL, WITH 110 GALLONS SOLVENT AND 104 BBLS FRESH WATER. |
Total fluid used in treatment (bbls): | 154 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 104 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/5/2016 | Treatment End Date: | 12/5/2016 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL AND 110 GALLONS SOLVENT WITH 154 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 204 | Max pressure during treatment (psi): | 2256 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 154 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/4/2014 | Treatment End Date: | 12/4/2014 |
Treatment Summary: | PUMP 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 227 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 132 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/13/2014 | Treatment End Date: | 5/13/2014 |
Treatment Summary: | ACID STIMULATION |
Total fluid used in treatment (bbls): | 263 | Max pressure during treatment (psi): | 1900 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 96 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 167 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 8/9/2011 |
Treatment Summary: | ACID STIMULATION - PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF TUBING 6250' AT STARTING PRESSURE OF 1000 PSI @ 3/4 BPM. |
Formation Treatment |
Treatment Date: | 3/11/2010 |
Treatment Summary: | OH 6415-6720. ACID STIMULATION 3/11/2010 PUMPED 4000 GALLONS OF 20 PERCENT HCI THROUGH END 6590. AT STARTING PRESSURE OF 1829. |