| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/10/2025 | Treatment End Date: | 11/10/2025 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15 % HCL w/solvent and 35 bbls fresh water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/21/2025 | Treatment End Date: | 3/21/2025 |
| Treatment Summary: | PUMPED 4000 GALLONS (95 BBLS) 15% HCL WITH SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/16/2022 | Treatment End Date: | 5/16/2022 |
| Treatment Summary: | PUMPED 4000 GALLONS (95 BBLS) 15% HCL WITH SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2300 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/4/2020 | Treatment End Date: | 4/4/2020 |
| Treatment Summary: | PUMPED 4000 GALLONS (95 BBLS) 15% HCL WITH SOLVENT AND 38 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 133 | Max pressure during treatment (psi): | 2300 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/15/2014 | Treatment End Date: | 5/15/2014 |
| Treatment Summary: | ACID STIMULATION |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/6/2012 | Treatment End Date: | 7/6/2012 |
| Treatment Summary: | ACID STIMULATION 7/6/2012 PUMPED 4000 GALLONS 15% HCL AT 3.7 BPM @ 1400 PSI |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 7/29/2010 |
| Treatment Summary: | ACID STIMULATION 7/29/2010 PUMPED 4000GALLONS OF 20% HCI THROUGH TUBING AT 6444.2 AT 2.5 BPM@660PSI.' |
| Formation Treatment |
| Treatment Date: | 2/8/2008 |
| Treatment Summary: | ACIDIZE FORMATION WITH 4015 GALLONS HEATED 15% HCL, EOT @ 6360 |