| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/23/2025 | Treatment End Date: | 9/23/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER.
|
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2620 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/5/2025 | Treatment End Date: | N/A |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls fresh water. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 1/22/2024 | Treatment End Date: | 1/22/2024 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2700 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/18/2021 | Treatment End Date: | 6/19/2021 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER
CONVERTED TO INJECTION 04-14-2011 |
| Total fluid used in treatment (bbls): | 140 | Max pressure during treatment (psi): | 1170 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |