Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06325
Well Classification: ERIW Status: IJ - 4/6/2022
Well Name/No:HAGOOD M C #A-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date4/6/2022
FacilityID:229234LocationID:314674
County:RIO BLANCO #103Location:NWNW 15 2N103W 6
Field:RANGELY - #72370Elevation:5620 ft.
Planned Location:660FNL  760 FWLLat/Long: 40.148398 / -108.949011Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.148577 / -108.949216Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 4/6/2022             Measured TD: 6730 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 4/6/2022
Wellbore Permit
Permit #:011241 Expiration Date:6/26/2002
Prop Depth/Form:
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBER S Unit Number: 
Formation And Spacing:Code: UNK , Formation: UNKNOWN , Order: 0 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 2-38 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/21/1947
Spud Date:8/28/2001Spud Date Is:ACTUAL
Measured TD:6730 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 603 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 603 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6625 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: , Bottom: 6625 ft., Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 4/6/2022                  Interval Top: 6625 ft.    Interval Bottom: 6863 ft.

 Completed Information for Formation WEBER
1st Production Date:10/10/2001Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/4/2022Treatment End Date:4/4/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER. RE-ENTERED AND CONVERTED TO INJECTION 10/10/2001.
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/16/2014Treatment End Date:12/16/2014
Treatment Summary:PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):200Max pressure during treatment (psi):1700
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):105Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/14/2010
Treatment Summary:ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCI, EOT @ 6755' STARTING PRESSURE OF 800 PSI.
Formation Treatment
Treatment Date:2/24/2009
Treatment Summary:ACIDIZE FORMATION W/ 4000 GALS HEATED 20% HCI, EOT@ 6700'.
Tubing Size:2.875 in.Tubing Setting Depth:6700 ft.
Tubing Packer Depth:6416 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6625 ft.# Of Holes:
Interval Bottom:6863 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)221937
GOR
GOR DeterminationMCFE
Average BOE per Day103.520
Average MCFE per Day600.403

 Federal Financial Assurance  i Y

 Tribal Well  i No