Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06291
Well Classification: ERIW Status: IJ - 4/30/2024
Well Name/No:SHARPLES-MCLAUGHLIN #4-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date4/30/2024
FacilityID:229204LocationID:314655
County:RIO BLANCO #103Location:SESE 33 2N102W 6
Field:RANGELY - #72370Elevation:5243 ft.
Planned Location:660FSL  660 FELLat/Long: 40.093986 / -108.840995Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.094110 / -108.841280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 4/30/2024             Measured TD: 6335 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 4/30/2024
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/1/1946
Measured TD:6335 ft.Measured PB depth:6334 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: 0 in., Size: 13.375 in., Top: 0 ft., Depth: 66 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 0 in., Size: 9.625 in., Top: 0 ft., Depth: 2784 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 2784 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 0 in., Size: 7 in., Top: 0 ft., Depth: 5660 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: , Bottom: 5660 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 6 in., Size: 0 in., Top: 5660 ft., Depth: 6335 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3115 ft.
MORRISON3210 ft.
CURTIS3842 ft.
ENTRADA3950 ft.
CARMEL4097 ft.
NAVAJO4146 ft.
CHINLE4749 ft.
SHINARUMP4870 ft.
MOENKOPI4915 ft.
WEBER5600 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 4/30/2024                 Interval Top: 5613 ft.    Interval Bottom: 6335 ft.

 Completed Information for Formation WEBER
1st Production Date:10/14/1966Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/29/2024Treatment End Date:4/29/2024
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ MUTUAL SOLVENT AND 40 BBLS WATER
Total fluid used in treatment (bbls):135Max pressure during treatment (psi):2530
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/15/2023Treatment End Date:5/15/2023
Treatment Summary:PUMPED 18 BBLS 15% HCL / SOLVENT / ACROEIN AND 296 BBLS WATER
Total fluid used in treatment (bbls):314Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):296Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/15/2021Treatment End Date:7/15/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT, 40 BBLS WATER
Total fluid used in treatment (bbls):135Max pressure during treatment (psi):2090
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/7/2018Treatment End Date:9/7/2018
Treatment Summary:PUMPED 2000 GALLONS 15% HCL ACID WITH 95 BBLS FRESH WATER AND 110 GALLONS SOLVENT AT STARTING 0.8 BPM 1800 PSI.
Total fluid used in treatment (bbls):145Max pressure during treatment (psi):2080
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):95Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/28/2015Treatment End Date:5/28/2015
Treatment Summary:Acid stimulation - pumped 4000 gallons 15% HCl.
Total fluid used in treatment (bbls):195Max pressure during treatment (psi):3700
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):100Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/30/2011
Treatment Summary:ACID STIMULATION - PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF TUBING @ 6262' AT STARTING PRESSURE OF 1BPM @ 1550 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:6293 ft.
Tubing Packer Depth:5333 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5613 ft.# Of Holes:24
Interval Bottom:6335 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)204028
GOR
GOR DeterminationMCFE
Average BOE per Day96.029
Average MCFE per Day557.006

 Federal Financial Assurance  i 

 Tribal Well  i No